Solar Tube Well vs Diesel - Monthly Savings Math and Payback Analysis
Updated 30 October 2026 · By SolarNevs Research Desk, Dealer surveys + verified sources · 20 sources · Method ↗

Key Takeaways
- OGRA's ex-depot price for high-speed diesel was Rs 398.07 per litre on 28 October 2026, up from Rs 389.27 on 20 October and Rs 360.06 on 21 July. Pumps pay more because ex-depot excludes secondary freight.
- Fuel burn is a large unknown. A 2003 IWMI survey reported 1.5-2.5 litres per hour for Chinese pump and slow-speed diesel sets and 3.5-5.0 for tractor-operated tube wells. An Indian engine maker's undated catalogue works out to about 3.5 litres per hour for a 15 hp engine if its fuel figure applies at rated output (our arithmetic).
- The same 2003 IWMI paper found diesel tube wells in its Punjab survey ran 6 hours a day on 120 days a year, about 60 hours a month. A Punjab planning study assumed 1,600 hours a year, about 133 hours a month. Both are old and neither is a 2026 average.
- On fuel alone, a 15 HP solar system pays back in 7.9 to 41.9 months across those inputs and five retail prices from three sellers. The shortest figures use Alpha Solar's prices, which do not list a pump. More pumping hours shorten payback.
- The two panel datasheets we read give a 25-year (LONGi) and a 30-year (JinkoSolar) linear power warranty. A warranty is not a lifespan.
Introduction
Solar tube wells are usually sold on the fuel they replace. Whether that sale is a good one depends on three numbers that farms rarely measure: how many litres the engine burns, how many hours it runs, and what a litre costs. This guide takes each from a published source, shows the sum, and says where the sources run out.
What does diesel cost per litre in Pakistan?
OGRA, the oil regulator, publishes the maximum ex-depot price of high-speed diesel (HSD) in its price publications. It excludes secondary freight, the cost of moving fuel from the depot to the pump, so a pump in a town charges more.
Effective date | HSD ex-depot price per litre |
|---|---|
21 July 2026 | Rs 360.06 |
31 July 2026 | Rs 393.04 |
20 October 2026 | Rs 389.27 |
27 October 2026 | Rs 395.82 |
28 October 2026 | Rs 398.07 |
The price moves from day to day. OGRA's page lists a price publication for most working days, and its sheet says the full impact of a change in the daily international price is passed on in seven working days. Use the figure for the day you read this, not the one in the table.
How much diesel does a tube-well engine burn?
No source we found gives litres per hour for a 15 hp engine at irrigation load in Pakistan. These are the nearest figures, and they disagree.
Source | What it describes | Fuel use |
|---|---|---|
IWMI survey of Pakistan's private tube wells (2003) | Field average, Chinese pump and slow-speed diesel engine sets | 1.5-2.5 litres per hour |
Same IWMI paper | Field average, tractor-operated tube wells | 3.5-5.0 litres per hour |
Punjab diesel tube-well model, IJRETR (2015) | Planning figure for all diesel tube wells in the province, 2013 prices | 2 litres per hour |
Same paper | Planning case for one 20 hp tube well | 3 litres per hour |
Kirloskar engine catalogue (undated, dealer-hosted) | Specific fuel consumption of 195 gm/hp-hr +5% for its 10, 16 and 20 hp air-cooled engines; the load point is not stated and the engines we read in it are 10, 14, 16 and 20 hp, not 15 hp | About 3.5 litres per hour for 15 hp if the figure applies at rated output (our arithmetic) |
The catalogue arithmetic is hp times grams per hp-hour, divided by 838 grams per litre, the typical density on an Attock Refinery diesel data sheet: 15 × 195 ÷ 838 is about 3.5. Oklahoma State University's extension service takes a different route. It expects an irrigation diesel engine to develop about 16.49 HP-hr per US gallon and says to deduct 20 percent from advertised horsepower for continuous load. For a 15 hp engine that is about 12 hp, or about 2.75 litres an hour (our arithmetic).
So the sources put a pump engine anywhere from 1.5 to 3.5 litres an hour, and a tractor-driven set higher. They do not tell you where your engine sits. Measure yours with a graduated container over a full pumping hour.
How many hours a year does a diesel tube well run?
The 2003 IWMI paper's Punjab survey of diesel tube wells gives an average of 6 hours a day on 120 days a year, about 60 hours a month. The 2015 Punjab model assumes 1,600 hours a year, about 133 hours a month. Both are old and neither is a 2026 average. Your own hours decide the result.
What is the monthly fuel bill?
Hours times litres per hour times the price per litre. This table uses OGRA's ex-depot price of Rs 398.07 on 28 October 2026, so a pump price will be higher. It is a worked example, not a measurement.
Fuel burn | Cost per running hour | 60 hours a month | 133 hours a month |
|---|---|---|---|
2 litres per hour | Rs 796 | Rs 47,768 | Rs 105,887 |
3 litres per hour | Rs 1,194 | Rs 71,653 | Rs 158,830 |
At 3.5 litres per hour the cost per running hour is Rs 1,393.
What do solar tube wells cost?
Retail prices for a 15 HP system differ by seller and by what they include.
Seller (page date) | 15 HP price | What it covers |
|---|---|---|
Alpha Solar (edited 2025-09-02; price heading says 2023) | Rs 1,250,000 (L2 structure) to Rs 1,690,000 (pole mounting) | Panel count and VFD size not given for 15 HP; pump not listed |
Pakistan Solar Traders (modified 2026-08-16) | Rs 1,650,000 to Rs 1,900,000 | Panels, VFD, pump, structure and standard installation; excludes borewell drilling and civil works |
Solar Citizen (modified 2026-10-02) | 22 to 30 lakh | Panels, VFD, submersible pump, mounting, wiring and installation |
One lakh is 100,000 rupees. These are retailer prices, not quotes, and the pages do not explain the wide spread between them.
How long does the investment take to pay back?
Dividing a system price by the monthly fuel bill gives a simple fuel-only payback in months. It ignores engine repairs and lubricants, water delivered, borewell condition and changes in solar output. Rs 1,250,000 and Rs 1,690,000 are Alpha Solar's 15 HP prices, which do not list a pump. Rs 1,900,000 is the top of Pakistan Solar Traders' range for a complete system. Rs 2,200,000 and Rs 3,000,000 are the ends of Solar Citizen's 22 to 30 lakh range, which includes the pump and installation.
System price | 60 hours a month, 3 litres an hour | 133 hours, 3 litres an hour | 133 hours, 2 litres an hour |
|---|---|---|---|
Rs 1,250,000 | 17.4 months | 7.9 months | 11.8 months |
Rs 1,690,000 | 23.6 months | 10.6 months | 16.0 months |
Rs 1,900,000 | 26.5 months | 12.0 months | 17.9 months |
Rs 2,200,000 | 30.7 months | 13.9 months | 20.8 months |
Rs 3,000,000 | 41.9 months | 18.9 months | 28.3 months |
Published paybacks disagree, and none comes from a measured Pakistani 10-15 HP comparison with stated assumptions:
- Pakistan Solar Traders, a seller: most systems pay for themselves within 1.5 to 3 years.
- Solar Citizen, a seller: 4-6 years for a 10 HP system at roughly 18 lakh with 3-4.5 lakh in annual diesel savings.
- A 2023 peer-reviewed review in Water: a solar irrigation payback of 3 to 5 years, with no assumptions in the passage we read.
- A Dawn opinion column of 12 April 2026: two to three years, with no assumptions given.
What does payback depend on?
- Hours. A Nepal study of a small 1.5 HP solar pump against a 5 HP diesel set found solar needed at least 700 hours a year to compete. That is a different country and pump size, but it shows the direction: a pump that runs few hours recovers little.
- Depth. IWMI's 2021 report says that for depths greater than 100 feet the cost of solar tube wells increases significantly and becomes uneconomical.
- Sunlight hours. The same report notes that solar pumps can only operate during sunlight hours.
- Fuel. The sums above scale directly with the diesel price. A cheaper litre lengthens payback.
- Non-fuel diesel costs. Lubricant changes, repairs and engine replacement are real, but the sources we found price them only for 2003 and 2013, so the tables above leave them out.
How long do solar panels last?
Datasheets state warranties, not lifespans. JinkoSolar's JKM580-605N panel carries a 12-year product warranty and a 30-year linear power warranty, with 1 percent first-year degradation and 0.40 percent a year after, ending at 87.4% at year 30. LONGi's LR5-72HTHF carries a 15-year warranty for materials and processing and a 25-year warranty for extra linear power output, with 0.40% a year from year 2 to 25. Neither datasheet says panels stop working when the warranty ends.
Summary and Recommendations
- Measure your engine's litres per hour and your annual pumping hours before any quote. With retail system prices spread two- to three-fold, litres per hour, hours and system price all move payback.
- Use the day's OGRA price, then add the secondary freight your pump charges.
- Compare solar quotes by what they include: pump, installation, borewell work and structure.
- Check the well depth. IWMI's 2021 report says solar tube wells deeper than 100 feet become uneconomical.
- Related guides: drip irrigation and solar combo economics and the solar pump VFD selection guide.
Correction, 28 October 2026: earlier versions of this guide used a diesel price, a fuel-burn figure, pumping hours, a system price, a payback and a 10-year saving that could not be traced to any source, and two of its own monthly fuel costs disagreed. They have been replaced.
Solar tube-well quotes from installers who work in your district
Tell us pump size and district. We pass your number to installers who quote against the surveyed prices on this page.
How this pays for the site: installers pay SolarNevs a fixed introduction fee when we pass them a genuine enquiry. They cannot pay to appear higher, and our surveyed prices are published before any introduction. You can also take our dated price tables straight to any installer.
Frequently asked questions
How much diesel fuel does a 15HP tube well engine consume per hour?
There is no single Pakistani figure. A 2003 IWMI field survey reported 1.5-2.5 litres per hour for Chinese pump and slow-speed diesel engine sets and 3.5-5.0 litres per hour for tractor-operated tube wells; its sentence gives no engine size. In an Indian engine maker's undated catalogue the engines we read are 10, 14, 16 and 20 hp, not 15 hp, but if its 195 gm/hp-hr figure applies at rated output a 15 hp engine would burn about 3.5 litres per hour (our arithmetic). Measure your own engine before trusting any of these.
What is the monthly fuel cost for running a diesel tube well in Pakistan?
Multiply hours by litres per hour by the price per litre. At OGRA's ex-depot price of Rs 398.07 per litre on 28 October 2026, 60 hours a month at 2 to 3 litres per hour costs Rs 47,768 to Rs 71,653, and 133 hours costs Rs 105,887 to Rs 158,830. Pump prices run higher than ex-depot because secondary freight is added.
What is the payback period for converting a diesel pump to solar power?
On fuel savings alone the cases in this guide give 7.9 to 41.9 months, depending on pumping hours, fuel burn and which system price you use. The shortest cases use a price that does not list a pump. Pakistan Solar Traders, a seller, says most systems pay for themselves within 1.5 to 3 years, and Solar Citizen, also a seller, says 4-6 years for a 10 HP system at roughly 18 lakh with 3-4.5 lakh in annual diesel savings. Any single figure is an estimate until you have your own fuel bill and pumping hours.
References
- OGRA price publication effective 28 October 2026 — accessed 28 October 2026
- OGRA price publication effective 27 October 2026 — accessed 28 October 2026
- OGRA price publication effective 20 October 2026 — accessed 28 October 2026
- OGRA price publication effective 21 July 2026 — accessed 28 October 2026
- OGRA price publication effective 31 July 2026 — accessed 28 October 2026
- OGRA price publications page — accessed 28 October 2026
- Qureshi, Shah and Akhtar (2003), The Groundwater Economy of Pakistan, IWMI Working Paper 64 — accessed 28 October 2026
- Doggar and Alvi (2015), IJRETR Vol 4 No 6 (Punjab diesel tube well model) — accessed 28 October 2026
- Kirloskar Oil Engines agri business catalogue (dealer-hosted copy) — accessed 28 October 2026
- Oklahoma State University Extension, Comparative Energy Costs for Irrigation Pumping (BAE-1204) — accessed 28 October 2026
- Attock Refinery Ltd, High Speed Diesel technical data sheet — accessed 28 October 2026
- Alpha Solar - solar tubewell price list — accessed 28 October 2026
- Pakistan Solar Traders - solar tubewell price list — accessed 28 October 2026
- Solar Citizen - solar tubewell system price guide — accessed 28 October 2026
- JinkoSolar datasheet JKM580-605N-72HL4-(V) — accessed 28 October 2026
- LONGi datasheet LR5-72HTHF 565-600M — accessed 28 October 2026
- Hussain et al. (2023), Water 15(9) 1727 (review of solar irrigation in Pakistan) — accessed 28 October 2026
- IWMI SoLAR, Solar Irrigation in Pakistan: A Situation Analysis Report (2021) — accessed 28 October 2026
- Nepal Terai plain solar pumping study (2018) — accessed 28 October 2026
- Dawn opinion column, 12 April 2026 — accessed 28 October 2026
Related guides
More from sizing, net billing & installation.