GEPCO Net Metering Application Guide
Updated 15 September 2026 · By SolarNevs Research Desk, Dealer surveys + verified sources · 5 sources · Method ↗

Key Takeaways
- NEPRA net billing framework (July 2026) establishes a buyback export tariff of Rs 11 (July 2026) per kWh.
- Unprotected residential grid imports cost between Rs 50 and Rs 65 (July 2026) per kWh.
- Pairing solar with lithium battery storage optimizes evening peak shaving and shortens payback to ~3.2 years.
- All net billing applications require AEDB-certified installer documentation and official DISCO clearance.
Introduction
Understanding the net billing regulations and DISCO processes in Pakistan is essential for optimizing solar investment returns under the 2026 NEPRA policy framework.
How does the GEPCO net metering procedure work in Gujranwala and Sialkot?
Gujranwala Electric Power Company (GEPCO) manages electricity distribution across key industrial export hubs in Punjab, including Gujranwala, Sialkot, Gujrat, Narowal, Hafizabad, and Mandi Bahauddin districts. The GEPCO net metering application procedure allows industrial manufacturing units, commercial exporters, and residential property owners to register solar systems under NEPRA 2026 net billing rules.
The registration workflow involves application filing at the local GEPCO Sub-Divisional Office, transformer load capacity verification, physical site inspection, meter testing at the GEPCO laboratory, and installation of a bidirectional green meter.
What documents are required for a GEPCO net billing application?
Submitting accurate documentation prevents administrative delays during GEPCO technical screening.
GEPCO Application Document Checklist.
- NEPRA Schedule-I application form filled and signed by the registered electricity connection holder.
- Copy of applicant CNIC.
- Paid copy of recent GEPCO electricity bill showing sanctioned load.
- Single-line diagram (SLD) signed and stamped by a registered Professional Engineer.
- AEDB installer registration certificate (Category C-1 or higher).
- Technical datasheets and test reports for the solar inverter and PV modules.
- Certified earth pit test report verifying grounding resistance under 5 ohms.
What fees and meter costs apply to GEPCO prosumers?
GEPCO charges standardized processing fees established by NEPRA guidelines. The primary application processing fee is Rs 1,000 (July 2026) per kW of sanctioned load.
Expense Category | Official Rate | Recipient |
|---|---|---|
Application Fee | Rs 1,000 per kW | GEPCO Bank Account |
Bidirectional Green Meter | Rs 35,000 to Rs 50,000 | Approved Meter Vendor |
Meter Testing Fee | Rs 5,000 | GEPCO Meter Testing Lab |
Connection NOC | Included in Application Fee | GEPCO |
Figures as of July 2026.
Applicants pay fees directly into designated GEPCO bank accounts using official Pay Order demand notices.
What technical standards and inspection criteria does GEPCO enforce?
GEPCO field teams conduct physical technical inspections to ensure industrial and residential solar installations meet safety standards.
GEPCO Field Inspection Standards.
- Anti-Islanding Shutdown - Automatic inverter disconnect within 2 seconds of grid power failure.
- Grounding Resistance - Earthing pit resistance verified below 5 ohms using calibrated earth testing meters.
- Protection Boxes - Heavy-duty AC and DC surge protection devices installed in sealed distribution enclosures.
- Lockable Disconnect Switch - External AC isolator switch mounted near the GEPCO utility meter.
- Module Barcode Audit - Serial numbers inspected under glass to prevent counterfeit module registration.
How can GEPCO prosumers audit monthly billing statements?
GEPCO monthly billing statements calculate grid imports and exports separately. Imports are billed at standard tariff slab rates of Rs 50 to Rs 65 (July 2026) per kWh for unprotected categories.
Exports are credited at the fixed buyback tariff of Rs 11 (July 2026) per kWh.
GEPCO Bill Audit Procedure.
- Confirm meter reading dates match physical green meter display checks.
- Verify Code 01 (Import kWh) and Code 02 (Export kWh) values.
- Multiply Export kWh by Rs 11 (July 2026) to confirm export credit calculation.
- Report billing discrepancies to the GEPCO Revenue Office or call helpline 118.
Want an installer who handles the net-metering paperwork?
We introduce you to installers who file the DISCO application for you and quote against our surveyed prices.
How this pays for the site: installers pay SolarNevs a fixed introduction fee when we pass them a genuine enquiry. They cannot pay to appear higher, and our surveyed prices are published before any introduction. You can also take our dated price tables straight to any installer.
Frequently asked questions
What is the application fee for GEPCO net metering?
GEPCO charges an official application processing fee of Rs 1,000 (July 2026) per kW of sanctioned load.
Which cities are served by GEPCO for net billing applications?
GEPCO serves Gujranwala, Sialkot, Gujrat, Narowal, Hafizabad, and Mandi Bahauddin districts.
How long does GEPCO take to install a net billing green meter?
GEPCO processing typically takes between 30 and 45 working days from submission to final bidirectional meter commissioning.
References
- GEPCO Profile page - stated jurisdiction districts (Gujranwala, Hafizabad, Sialkot, Gujrat, Narowal, Mandi Baha-ud-din), distribution licence 04/DL/2002, 17,206 sq km service area, and the 118 round-t — accessed 7 September 2026
- NEPRA Schedules II-V download from the PITC Net Billing Portal (DISCOs incl. GEPCO) - Schedule-II standard net billing application form, plus Schedules III-V (DOCX) — accessed 7 September 2026
- NEPRA (Prosumer) Regulations 2026, SRO 251(I)/2026 - application steps and working-day timelines, Schedule-I agreement, Rs 1,000/kW concurrence fee (Schedule-IV), net billing at national average energ — accessed 6 September 2026
- NEPRA decision on consumer-end tariff, 12 January 2026 - residential slab rates by DISCO incl. GEPCO (PDF hosted by GEPCO) — accessed 6 September 2026
- Inspection of Electrical/DG Installations as per AEDB Regulations - installer commissioning checklist (anti-islanding, lockable disconnect switch, DC/AC grounding, UL 1741 inverter) on the PITC Net Bi — accessed 6 September 2026
Related guides
More from sizing, net billing & installation.