Schemes, Subsidies & Financing

There is real money on the table: the PM E-Bike Scheme, the Punjab student e-bike scheme, the Rs 400,000 e-rickshaw subsidy and the provincial solar schemes. Each runs its own portal, eligibility test and closing date, and most applications fail on paperwork rather than on merit. These guides walk the application first, then the duties and levies that follow.

8 guides in this pillar · clusters M3 · How we verify ↗

Every guide in money

Grouped by the question it answers.

What is the policy actually saying?

The NEV Policy targets, registration and green plates, and where petrol is headed.

Run the numbers

Start here

New to this? Read these three, in order.

  1. Commercial Solar in Saudi Arabia: Tariffs, Limits and the Business Case (August 2026)

    What changes when the roof belongs to a business: commercial tariff slabs, a lower export credit, the 1kW-2MW scope, and grid limits only C&I projects meet.

  2. Industrial Solar Tariffs and Payback in Saudi Arabia: Factory Energy Economics

    How industrial electricity tariffs shape solar payback in Saudi Arabia: tiered rates up to 20 halalas, 5 halala export credits, and off-grid rules above 1 MW.

  3. Rooftop Solar Payback in Saudi Arabia: The Arithmetic (August 2026)

    Break-even arithmetic for Saudi rooftop solar, built only from verified SAR prices and reported tariffs and expressed in kilowatt-hours — no invented yield.