Guides — United States

Every guide answers its question in the first two sentences, dates every price, and names every source. 434 published, grouped into the questions buyers actually ask.

Reading elsewhere? Canada guides · Nigeria guides · New Zealand guides · Pakistan guides · United Arab Emirates guides · Saudi Arabia guides · Ireland guides · Australia guides · United Kingdom guides · South Africa guides

Start with your question

All guides — page 15 of 19

Money

Schemes, instalments, loans — what can I actually get?

MoneyUpdated 18 Sept 2026

State EV Incentives in 2026: The Post-Federal Map

With the federal credit dead since September 2025, state programs are the whole game — funded, waitlisted, exhausted or expired. The nine-state scorecard.

MoneyUpdated 18 Sept 2026

Texas ERCOT Solar Buyback Plans and Net Metering Guide

How to choose Texas ERCOT solar buyback plans. Learn REP contract terms, fixed vs wholesale rates, TDU delivery charges, and smart meter requirements.

MoneyUpdated 18 Sept 2026

Texas PUC Rule 25.211: Distributed Generation Interconnection Guide

Understand Texas PUCT Substantive Rule §25.211 for on-site distributed generation interconnection. Covers capacity limits, study fees, and timelines as of Au...

MoneyUpdated 18 Sept 2026

Texas PUC Rule 25.212 DG Technical Interconnection Standards Guide

Understand Texas PUC Rule 25.212's technical requirements for distributed generation interconnection. This guide details frequency, voltage, and power qualit...

MoneyUpdated 18 Sept 2026

The Big Beautiful Bill and Solar Tax Credits, Explained

What the One Big Beautiful Bill Act changed for solar: the 25D homeowner credit ended Dec 31, 2025, the EV charger credit June 30, 2026, and 48E got deadlines.

MoneyUpdated 18 Sept 2026

The Solar Installation Process, Step by Step (And Where It Stalls)

Panels go up in a day or two; the other eight weeks are permits, interconnection, inspection and PTO. Every stage, who controls it, and where projects stall.

MoneyUpdated 18 Sept 2026

TVA Dispersed Power Production and Solar Interconnection Guide

Understand the TVA Dispersed Power Production (DPP) program for solar interconnection, including avoided-cost rates, metering options, and regulatory...

MoneyUpdated 18 Sept 2026

TVA Green Connect Quality Contractor Network Solar Guide: Requirements for Residential Installations

The TVA EnergyRight Green Connect program sets mandatory standards for residential solar and battery installations, requiring QCN certified contractor...

MoneyUpdated 18 Sept 2026

US BLM 43 CFR 2804.25: Solar ROW Application Guide

Compliance guide for BLM 43 CFR 2804.25 (August 2026). Master solar ROW application steps, Plan of Development (POD) mandates, and cost recovery fees.

MoneyUpdated 18 Sept 2026

US BLM 43 CFR 2804.35: Solar ROW Prioritization Guide

Compliance guide for BLM 43 CFR 2804.35 (August 2026). Master solar ROW prioritization, Designated Leasing Areas, and resource conflict avoidance.

MoneyUpdated 18 Sept 2026

US BLM 43 CFR 2805.12: Solar ROW Terms & Bonding Guide

Compliance guide for BLM 43 CFR 2805.12 (August 2026). Master solar ROW grant terms, wildfire prevention, erosion control, and POD covenants.

MoneyUpdated 18 Sept 2026

US BLM 43 CFR 2805.14: Solar Grant Rights & Access Guide

Compliance guide for BLM 43 CFR 2805.14 (August 2026). Master solar ROW rights, subleasing limits, access road maintenance, and assignment approvals.

MoneyUpdated 18 Sept 2026

US BLM 43 CFR 2805.16: Cost Recovery Fees Guide

Compliance guide for BLM 43 CFR 2805.16 & 2805.17 (August 2026). Master right-of-way cost recovery fee tiers, master agreements, and monitoring rules.

MoneyUpdated 18 Sept 2026

US BLM 43 CFR 2805.20: Solar Bonding Requirements Guide

Compliance guide for BLM 43 CFR 2805.20 (August 2026). Master solar ROW bonding rules, RCE estimates, and the $10,000 per acre floor on public lands.

MoneyUpdated 18 Sept 2026

US BLM 43 CFR 2806: Solar Rights-of-Way Rent & Capacity Fees Guide

Federal compliance guide for BLM 43 CFR 2806.52 (August 2026). Master solar acreage rent formulas, 100% encumbrance, and 3.9% capacity fees.

MoneyUpdated 18 Sept 2026

US BLM 43 CFR 2807.17: Grant Assignment & Termination Guide

Compliance guide for BLM 43 CFR 2807.17 & 2807.21 (August 2026). Master right-of-way suspension, 5-year abandonment, cure notices, and assignment rules.

MoneyUpdated 18 Sept 2026

US BLM 43 CFR 2809: Competitive Solar Leasing & Nomination Guide

Compliance guide for BLM 43 CFR 2809.11 (August 2026). Master public land solar leasing, $5/acre nomination fees, and Federal Register notices.

MoneyUpdated 18 Sept 2026

US Commercial Solar MACRS Depreciation and Tax Basis Guide

Master commercial solar 5-year MACRS depreciation. Learn the 85% depreciable basis rule after ITC reduction, bonus depreciation, and 5-year recapture terms.

MoneyUpdated 18 Sept 2026

US DOE 10 CFR 436.14: Federal Solar Life Cycle Costing Guide

Compliance guide for DOE 10 CFR 436.14 (August 2026). Master federal solar LCCA study periods up to 25 years, FEMP discount rates, and EIA projections.

MoneyUpdated 18 Sept 2026

US DOE 10 CFR 436.19: Federal Solar Life Cycle Cost Guide

Compliance guide for DOE 10 CFR 436.19 (August 2026). Master federal solar Life Cycle Cost (LCC) formulas, present values, and salvage accounting.

MoneyUpdated 18 Sept 2026

US DOE 10 CFR 436.33: Federal Solar ESPC Contractor Guide

Compliance guide for DOE 10 CFR 436.33 (August 2026). Master federal solar ESPC contractor selection, qualified ESCO lists, and guaranteed savings.

MoneyUpdated 18 Sept 2026

US DOE 10 CFR 436.37: Federal Solar ESPC Annual Audit Guide

Compliance guide for DOE 10 CFR 436.37 (August 2026). Master annual energy audits, guaranteed solar savings verification, and baseline adjustment rules.

MoneyUpdated 18 Sept 2026

US FERC 18 CFR 35.28 Small Generator Interconnection Guide

Understand US FERC 18 CFR 35.28 regulations for small generator interconnection, including SGIP, study penalties, and DER aggregation (August 2026).

MoneyUpdated 18 Sept 2026

US FERC 18 CFR 35.35 Transmission Incentives: A Solar Integration Guide

This guide details US FERC 18 CFR 35.35, outlining transmission infrastructure investment incentives for grid reliability and solar integration (August 2026).