Key Takeaways

  • Regulation 44D is part of S.I. 2021 No. 1392, specifically addressing EV charge points in new residential buildings.
  • New residential buildings with associated parking must install EV charge points up to an average sum of £3600 for connection costs.
  • If the £3600 cap prevents full installation, cable routes must be installed in all remaining parking spaces.
  • The regulation applies to the erection of a new residential building with associated parking.

What is UK Building Regulations Part S Regulation 44D?

Regulation 44D, titled "Electric vehicle charge points: new residential buildings," is a key part of "The Building Regulations etc. (Amendment) (England) (No. 2) Regulations 2021" (S.I. 2021 No. 1392). This regulation mandates the installation of electric vehicle charge points in new residential buildings in England that include associated parking (August 2026). It falls under "PART S Infrastructure for the charging of electric vehicles."

The primary goal is to ensure that new homes are built with the necessary infrastructure to support the growing adoption of electric vehicles. This includes provisions for both direct charge point installation and the preparation for future installations through cable routes.

Key Provisions of Regulation 44D

Provision Parameter

Statutory Limitation / Requirement

Statutory Title Citation

"# The Building Regulations etc. (Amendment) (England) (No. 2) Regulations 2021"

Statutory Instrument Citation

"2021 No. 1392"

Regulation 44D Heading

"Electric vehicle charge points: new residential buildings"

Regulation 44D Application Scope

"The requirements of paragraph S1 of Schedule 1 apply in relation to the erection of a new residential building with associated parking as follows."

£3600 Connection Cost Cap

"The number of electric vehicle charge points that must be installed is the maximum number of electric vehicle charge points that it is possible to install at an average sum of £3600 or less for the connection cost of each electric vehicle charge point connection ("the £3600 cap")."

Cable Routes Fallback Requirement

"If it is not possible to completely fulfil the requirements of paragraph S1(2) of Schedule 1 as a result of the operation of the £3600 cap, cable routes for electric vehicle charge points must be installed in all remaining parking spaces."

Schedule 1 Part S Classification

"PART S Infrastructure for the charging of electric vehicles"

Paragraph S1 Schedule 1 Citation

"paragraph S1 of Schedule 1"

Associated Parking Scope

"erection of a new residential building with associated parking"

Connection Cost Calculation Rule

"average sum of £3600 or less for the connection cost"

| Cable Routes Installation Duty | "cable routes for electric vehicle charge points must be installed" | Figures as of August 2026.

How We Verified These Regulations

We verified the details of Regulation 44D by directly consulting the official UK government legislation website. Our review on 23 August 2026 focused on "The Building Regulations etc. (Amendment) (England) (No. 2) Regulations 2021," specifically Statutory Instrument 2021 No. 1392. All cited provisions, including the £3600 connection cost cap and the cable routes fallback requirement, are directly quoted from this primary source.

Understanding the £3600 Connection Cost Cap

Regulation 44D introduces a specific financial limit for the installation of EV charge points: "The number of electric vehicle charge points that must be installed is the maximum number of electric vehicle charge points that it is possible to install at an average sum of £3600 or less for the connection cost of each electric vehicle charge point connection ("the £3600 cap")." This means developers must assess the cost of connecting each charge point. If the average connection cost exceeds £3600, they are not required to install a charge point at that specific location.

This cap aims to balance the mandate for EV infrastructure with the practicalities of development costs. It acknowledges that some sites may have prohibitively high connection costs, providing a financial safeguard for builders.

The Cable Routes Fallback Requirement

A critical aspect of Regulation 44D is the "cable routes fallback requirement." If the "£3600 cap" prevents the complete fulfillment of the charge point installation requirements, then "cable routes for electric vehicle charge points must be installed in all remaining parking spaces."

This provision ensures that even if a full charge point installation is not immediately feasible due to cost, the necessary groundwork for future EV charging is laid. Installing cable routes significantly reduces the cost and disruption of adding charge points later, promoting long-term EV readiness for new residential developments.

Pairing Residential EV Charging with Solar PV

While Regulation 44D focuses on the provision of EV charge points, it does not explicitly detail how these should be powered. Integrating domestic rooftop solar PV with residential EV charging offers a sustainable solution. New residential buildings, which are subject to Regulation 44D, are also prime candidates for solar installations.

Consider how the mandated EV infrastructure can be paired with a solar PV system to reduce reliance on grid electricity for vehicle charging. This approach can lower running costs for homeowners and contribute to the building's overall energy efficiency. You can explore options for sizing a solar system to meet your home's needs, including EV charging, using our solar sizing tool.

For further guidance on related building regulations and solar integration, you may find these guides helpful:

Understanding these regulations helps ensure compliance and allows for strategic planning of sustainable energy solutions in new residential developments.

Frequently asked questions

What is Regulation 44D of the UK Building Regulations?

Regulation 44D, part of S.I. 2021 No. 1392, mandates electric vehicle charge point installations in new residential buildings with associated parking in England. It specifies requirements under 'PART S Infrastructure for the charging of electric vehicles' (August 2026).

What is the £3600 cap for EV charge point connection costs?

The £3600 cap is an average sum limit for the connection cost of each electric vehicle charge point. Developers must install the maximum number of charge points possible within this average cost (August 2026).

What happens if the £3600 cap prevents full EV charge point installation?

If the £3600 cap prevents complete installation, cable routes for electric vehicle charge points must be installed in all remaining parking spaces. This ensures future readiness for EV charging (August 2026).

Which buildings does Regulation 44D apply to?

Regulation 44D applies to the erection of a new residential building with associated parking. It sets out specific requirements for these new constructions in England (August 2026).

What is the official citation for Regulation 44D?

Regulation 44D is officially cited within 'The Building Regulations etc. (Amendment) (England) (No. 2) Regulations 2021' and Statutory Instrument '2021 No. 1392' (August 2026).