City of Cape Town Approved Inverter List and SANS Compliance Guide

Updated 8 September 2026 · By SolarNevs Research Desk, Dealer surveys + verified sources · 3 sources · Method ↗

Electrician inspecting a wall-mounted solar inverter installation and electrical switchgear. — SolarNevs spec card

Key Takeaways

  • The City of Cape Town maintains a formal equipment schedule titled TYPE TESTED INVERTERS/EQUIPMENT IN TERMS OF NRS 097-2-1 2026/06/10.
  • Certified models include commercial and residential hardware such as the ABB ABB PVS - 50 - TL Grid-tied PV inverter and the Goodwe GOODWE GW10K-ES-C10 Hybrid PV inverter grid-tied.
  • Since 1 October 2023, all new solar PV and/or battery systems are being treated as grid-tied and must use City-approved inverters, have professional sign-off, and be authorised before switching on.
  • Solar PV geysers must be authorised, and follow the online SSEG application process, but do not require ECSA professional sign-off.
  • Systems using non-approved inverters will not be authorised, and connecting an unauthorised system is illegal under municipal bylaws.

The NRS 097-2-1 Equipment Register Structure

Connecting embedded generation in the City of Cape Town requires using equipment that has undergone independent laboratory type-testing. The municipal standard schedule, designated TYPE TESTED INVERTERS/EQUIPMENT IN TERMS OF NRS 097-2-1 2026/06/10, lists every certified inverter make, model, type, testing house, and certificate number.

The register covers both dedicated grid-tied inverters and hybrid storage systems across various commercial and residential capacities. Representative approved listings on the municipal schedule include:

Manufacturer

Model

Inverter Classification

Testing House / Scope

ABB

ABB PVS - 50 - TL

Grid-tied PV inverter

TÜV Rheinland (commercial installations)

Afore

AFORE AF10K-TH

Hybrid PV inverter grid-tied

Intertek (three-phase hybrid)

Alpha

ALPHA SMILE5-INV

Hybrid PV inverter grid-tied

Bureau Veritas (residential storage)

Atess

ATESS HPS 30

Hybrid PV inverter grid-tied

Shenzhen Balun (commercial microgrids)

GoodWe

GOODWE GW10K-ES-C10

Hybrid PV inverter grid-tied

Residential hybrid applications

  • ABB: The ABB ABB PVS - 50 - TL Grid-tied PV inverter, tested by TÜV Rheinland for commercial installations.
  • Afore: The Afore AFORE AF10K-TH Hybrid PV inverter grid-tied Intertek 2023/05/25, providing three-phase hybrid functionality.
  • Alpha: The Alpha ALPHA SMILE5-INV Hybrid PV inverter grid-tied Bureau Veritas, certified for residential energy storage.
  • Atess: The Atess ATESS HPS 30 Hybrid PV inverter grid-tied Shenzhen Balun, engineered for commercial microgrids.
  • GoodWe: The Goodwe GOODWE GW10K-ES-C10 Hybrid PV inverter grid-tied, approved for residential hybrid applications.

Manufacturer

Model Identifier

Inverter Classification

Testing / Certification Body

ABB

ABB PVS - 50 - TL

Grid-tied PV inverter

TÜV Rheinland

Afore

AFORE AF10K-TH

Hybrid PV inverter grid-tied

Intertek

Alpha

ALPHA SMILE5-INV

Hybrid PV inverter grid-tied

Bureau Veritas

Atess

ATESS HPS 30

Hybrid PV inverter grid-tied

Shenzhen Balun

GoodWe

GOODWE GW10K-ES-C10

Hybrid PV inverter grid-tied

Listed municipal register

The municipality strictly enforces adherence to this list: systems using non-approved inverters will not be authorised. Connecting an unauthorised system is illegal.

Sign-off Rules and Capacity Thresholds

In addition to certified hardware, solar PV installations must satisfy statutory sign-off requirements. Since 1 October 2023, all new solar PV and/or battery systems are being treated as grid-tied and must use City-approved inverters, have professional sign-off, and be authorised before switching on.

The technical sign-off framework establishes clear boundaries based on system scale and equipment type:

  • Small-Scale Embedded Generation (SSEG): The authorisation process for embedded generation installations applies to small-scale embedded generation (SSEG) systems with a generation capacity smaller than 1 mega-volt ampere (MVA).
  • Large Embedded Generation (EG): Larger installations, specifically embedded generation (EG) systems with a generation capacity of more than 1MVA and less than 100MVA in properties, require formal registration approval from the National Energy Regulator of South Africa (NERSA) before municipal authorisation can proceed.
  • Solar PV Water Heating Exception: While general solar systems require professional sign-off from an ECSA-registered professional, the City provides a specific exemption for dedicated thermal conversion: solar PV geysers must be authorised, and follow the online SSEG application process, but do not require ECSA professional sign-off.

Online Application via Energy Services Platform

To prevent administrative delays and ensure traceability, the municipality transitioned all submissions to a centralized portal: to improve the authorisation process for solar PV and/or battery systems, all applications for small-scale embedded generation in the City's electrical supply area must be done online via the Energy Services platform on e-Services.

Through this portal, applicants upload single line diagrams, Certificate of Compliance (CoC) documentation, and proof that the specified inverter models match the official approved inverter list.

Frequently asked questions

Which inverters are approved for installation in Cape Town?

Only inverters evaluated under TYPE TESTED INVERTERS/EQUIPMENT IN TERMS OF NRS 097-2-1 2026/06/10, including certified models from ABB, Afore, Alpha, Atess, and GoodWe, are approved.

Is professional engineering sign-off required for all solar installations in Cape Town?

Since 1 October 2023, all new solar PV and/or battery systems are being treated as grid-tied and must use City-approved inverters, have professional sign-off, and be authorised before switching on.

Do solar PV geysers require ECSA professional sign-off?

Solar PV geysers must be authorised, and follow the online SSEG application process, but do not require ECSA professional sign-off.

Where must SSEG applications be submitted in Cape Town?

All applications for small-scale embedded generation in the City's electrical supply area must be done online via the Energy Services platform on e-Services.