South Carolina Solar Act 62 And Net Metering Rider Guide

Updated 6 September 2026 · By SolarNevs Research Desk, Dealer surveys + verified sources · 1 source · Method ↗

Key Takeaways

  • Residential solar installations in South Carolina may qualify for a 30% federal income tax credit.
  • Energy storage systems with a capacity of 3 kilowatt-hours or greater are also eligible for this credit.
  • Grid-tied inverters must meet specific safety and anti-islanding standards like UL 1741-SB and IEEE 1547-2018.
  • Operating a solar generating facility without written Permission to Operate from the utility is prohibited.

Understanding South Carolina Solar Act 62 and Federal Incentives

The South Carolina Solar Act 62 establishes a framework for solar energy development in the state, including provisions for net metering. Alongside state-specific regulations, homeowners installing solar energy systems in South Carolina can benefit from federal incentives. The primary federal incentive is a tax credit designed to reduce the cost of clean energy installations.

What is actually going on with Federal Tax Credits

The federal government offers a significant incentive for homeowners to install solar panels and energy storage systems. This comes in the form of a tax credit, which directly reduces the amount of income tax you owe. The credit is applied against your total federal tax liability.

Qualified residential clean energy expenditures are eligible for a 30% federal income tax credit. This credit applies to the total cost of the solar installation. Additionally, qualified energy storage property with a capacity of 3 kilowatt-hours or greater also qualifies for these federal credits. These incentives are provided under Section 25D of the Internal Revenue Code (IRC).

Key Regulatory and Safety Standards for Solar Installations

Installing a solar energy system involves adherence to various safety and operational standards to ensure reliable and safe grid interconnection. These standards protect both the homeowner and the utility grid.

Standard / Requirement

What it means

What to do

Grid-tied Inverter Compliance

"Grid-tied solar inverters must comply with UL 1741-SB and IEEE 1547-2018 anti-islanding parameters."

Ensure your chosen inverter models are certified to these standards to prevent power feedback during grid outages.

AC Disconnect Switch

"A lockable utility-accessible AC disconnect switch is required within 10 feet of the revenue meter."

Install a clearly marked, lockable AC disconnect switch in the specified location for utility personnel access.

Overcurrent Protection

"Dedicated overcurrent protection devices must be sized according to NEC 705.12 120% busbar rules."

An accredited electrician must design and install overcurrent protection devices that meet National Electrical Code (NEC) requirements.

Rapid Shutdown

"Rooftop PV systems must incorporate rapid shutdown devices complying with NEC 690.12 specifications."

Ensure your rooftop PV system includes rapid shutdown technology for firefighter safety.

Equipment Grounding

"Equipment grounding conductors must be bonded directly to the main building service grounding electrode."

Proper grounding is critical for safety; ensure all equipment grounding conductors are correctly bonded.

Permission to Operate (PTO)

"Operating the generating facility prior to receiving written Permission to Operate is strictly prohibited."

Do not energise your system until you have received official written approval from your utility company.

Arc-Fault Protection

"Photovoltaic systems operating at 80 volts DC or greater require certified Type 1 AFCI protection."

Systems with higher DC voltages must include arc-fault circuit interrupter (AFCI) protection to mitigate fire risks.

Panelboard Connection

"Connection of generating sources to panelboards must follow the 120% ampacity calculation in NEC 705.12."

Electrical connections to your main service panel must be designed and installed by an accredited professional following NEC guidelines.

What you can check yourself, and what you cannot

As a homeowner, you can verify certain aspects of your solar project, but many critical steps require accredited professionals.

What you can check yourself:

  • System Eligibility: Confirm that your planned solar panels and energy storage systems meet the capacity requirements for federal tax credits (e.g., storage capacity of 3 kilowatt-hours or greater).
  • Documentation: Ensure you receive all necessary documentation, including inverter specifications, safety certifications, and utility interconnection agreements.
  • Physical Location of Disconnects: Verify that the utility-accessible AC disconnect switch is installed within 10 feet of your revenue meter as required.
  • Permission to Operate: Confirm you have received written Permission to Operate from your utility before the system is energised.

What you cannot check yourself (requires an accredited professional):

  • Inverter Compliance: Verifying that grid-tied solar inverters comply with UL 1741-SB and IEEE 1547-2018 anti-islanding parameters requires technical expertise and access to certification documents.
  • Overcurrent Protection Sizing: Sizing dedicated overcurrent protection devices according to NEC 705.12 120% busbar rules is a complex electrical engineering task.
  • Rapid Shutdown Device Installation: Ensuring rooftop PV systems incorporate rapid shutdown devices complying with NEC 690.12 specifications requires certified installation.
  • Equipment Grounding: Bonding equipment grounding conductors directly to the main building service grounding electrode must be performed by a qualified electrician.
  • AFCI Protection: Installing certified Type 1 AFCI protection for photovoltaic systems operating at 80 volts DC or greater is a specialised electrical task.
  • Panelboard Connection: Connecting generating sources to panelboards following the 120% ampacity calculation in NEC 705.12 requires professional electrical design and installation.

Any work involving electrical wiring, grid interconnection, or safety device installation must be performed by licensed and accredited professionals to ensure compliance with all applicable codes and regulations.

What the published sources do not tell you

While federal guidelines provide clear criteria for tax credits and general safety standards, specific details regarding utility interconnection and net metering riders often vary. The provided federal sources do not detail the specific terms of Dominion Energy or Duke Energy Solar Choice metering riders, nor do they outline the full scope of South Carolina's Act 62. These specifics, including tariff rates, contract lengths, and application processes, are typically found on the respective utility company websites or through the South Carolina Public Service Commission. Furthermore, site-specific engineering drawings, local utility connection capacity, and manufacturer equipment ratings are crucial for system architecture and sizing but are not covered by general regulatory documents. Wiring and isolation requirements, as well as detailed commissioning and maintenance protocols, are also subject to local codes and specific equipment manuals, which are beyond the scope of federal tax guidance.

Frequently asked questions

What are the primary technical requirements for south carolina solar act 62 and net metering rider guide?

Key requirements include compliance with local grid codes, correct equipment certification, and proper electrical isolation.

Who is authorized to install and inspect south carolina solar act 62 and net metering rider guide?

All high-voltage DC, AC grid tie-in, and switchboard modifications must be performed by a qualified, accredited electrical professional.

How is export power limited in south carolina solar act 62 and net metering rider guide?

Export limiting is achieved using certified bidirectional smart meters or power sensors providing dynamic feedback to the inverter system.