Guides — United Kingdom
Every guide answers its question in the first two sentences, dates every price, and names every source. 197 published, grouped into the questions buyers actually ask.
Reading elsewhere? Pakistan guides · United Arab Emirates guides · Saudi Arabia guides · United States guides · Ireland guides · Australia guides · South Africa guides
Start with your question
All guides — page 4 of 9
Buying
What should I buy, and how do I not get cheated?
UK DNO G100 Export Limitation Schemes Compliance Guide
Complete engineering guide to UK DNO G100 export limitation schemes. Understand G99 integration, 45-day review windows, and statutory ESQCR compliance.
UK DNO G98 Notification for Solar PV and Heat Pumps Guide
Master the UK DNO G98 notification process for solar PV and heat pumps. Learn the 28-day deadline, 16A per phase cap, and ENA database requirements.
UK DNO Substation Witness Testing and Energisation Guide
Guide to UK DNO substation witness testing, ENA Type Test Register verification, relay checks, and energisation.
UK Domestic Battery Fire Safety and PAS 63100 Guide
Complete UK guide to domestic battery fire safety and PAS 63100 standards. Master loft restrictions, Approved Document B, and general fire precautions.
UK Domestic Solar Permitted Development GPDO Class A: A Guide for 2026
Understand UK GPDO Part 14 Class A rules for domestic solar PV installation, including protrusion limits and conservation area restrictions, as of August 2026.
UK Electricity Act 1989 Schedule 9: Environmental Amenity Guide
Compliance guide for UK Electricity Act 1989 Schedule 9 (August 2026). Master statutory amenity duties, 10MW thresholds, and Schedule 9 statements.
UK Electricity Act 1989 Section 36: Generating Station Consent Guide
Compliance guide for UK Electricity Act 1989 Section 36 (August 2026). Master the 50MW capacity threshold, Wales 350MW cap, and DCO interactions.
UK Electricity Capacity Regulations 2014: A Guide for Storage and Solar
Guide to the UK Electricity Capacity Regulations 2014 (S.I. 2014/2043) for battery storage and solar assets, covering T-4 and T-1 capacity auctions.
UK Electricity Connection Charges Regulations 2017: A Second Comer Guide
Guide to UK Electricity Connection Charges Regulations 2017 (S.I. 2017/106), covering the 10-year second comer liability period and DNO cost reimbursement.
UK Electricity Licence Exemption Order 2001: A Guide to Private Wire Supply Schedule 4
Guide to UK Electricity Licence Exemption Order 2001 Schedule 4: Class A 5 MW/2.5 MW limits and Class C private wire supply rules (August 2026).
UK Electricity Licence Exemption Order 2001: Generation Schedule 2 Guide
Guide to UK Electricity Licence Exemption Order 2001 Schedule 2: 10 MW and 50 MW capacity limits and on-site generation rules (August 2026).
UK ENA G100 Issue 2 Export Limitation Compliance Guide
Technical compliance guide for ENA G100 Issue 2 export limitation schemes, fail-safe monitoring, and DNO approval.
UK ENA G100 Issue 2 Export Limitation Scheme Compliance Guide
Guide to ENA G100 Issue 2 export limitation compliance, fail-safe 5-second excursion limits, CT placement, and standards.
UK ENA G99 Type B Commercial Solar Commissioning and Testing Guide
Comprehensive guide to ENA G99 Type B commercial solar commissioning, Form B3, RoCoF protection, and DNO witness testing.
UK ENA G99 Type D Large Scale Solar Grid Compliance Guide
Master UK ENA G99 Type D compliance for utility-scale solar farms. Learn 50MW NSIP planning thresholds, 65-day HV review windows, and Grid Code rules.
UK Environmental Protection Act 1990 Section 79: Solar Statutory Nuisance Guide
Guide to UK Environmental Protection Act 1990 Section 79 for solar and BESS: statutory nuisance definitions, noise limits, and Best Practicable Means.
UK Environmental Protection Act 1990 Section 80 Solar Abatement Notices Guide
Guide to UK Environmental Protection Act 1990 Section 80 abatement notices: statutory nuisance enforcement, 21-day appeal window, and BPM legal defense.
UK EPB Regulations 2012 Regulation 6: Energy Performance Certificate Rules on Sale and Rent
Understand the UK Energy Performance of Buildings Regulations 2012, Regulation 6. Learn when and how to provide an EPC free of charge to buyers or tenants at...
UK EPB Regulations 2012 Regulation 9: Asset Rating and 10-Year Validity Guide
Understand Regulation 9 of the UK EPB Regulations 2012. This guide details asset rating requirements, accredited assessors, recommendation reports, and the 1...
UK ESQCR 2002 Regulation 21 Switched Alternative Sources Guide
Understand UK ESQCR 2002 Regulation 21 for alternative energy sources. Learn how to prevent dangerous backfeed to the DNO network and ensure BS 7671 compliance.
UK ESQCR 2002 Regulation 22: Parallel Generation and Safety Guide
Understand UK ESQCR 2002 Regulation 22 for safe parallel generation. Learn 16A exemption, DNO notification, and loss-of-mains requirements.
UK ESQCR 2002 Regulation 24: Consumer Equipment and BS 7671 Safety Guide
Understand UK ESQCR 2002 Regulation 24 for consumer premises equipment, ensuring safety and compliance for solar PV and battery storage installations.
UK ESQCR 2002 Regulation 25 Network Connection Consent Guide
Guide to UK ESQCR 2002 Regulation 25 DNO grid connection consent, BS 7671 safety standards, refusal grounds, and Secretary of State disputes.
UK ESQCR 2002 Regulation 26: Disconnection and Dispute Resolution Guide
Guide to UK ESQCR 2002 Regulation 26 on electricity supply disconnection, remedial notices from DNOs, and rights for dispute resolution.