Sizing, Net Billing & Installation

Size the system to your bill, not to your roof. Under net billing your exported units earn roughly Rs 11/kWh against the Rs 23.57–48 you pay to buy, so self-consumption and storage now beat export. These guides cover the DISCO application, kW-by-kW system costs, the 40-point install checklist, solar appliances, and agricultural pumping.

24 guides in this pillar · clusters M22 · How we verify ↗

Every guide in systems

Grouped by the question it answers.

More system guides

Everything else in this pillar.

Start here

New to this? Read these three, in order.

  1. AS/NZS 5139 Battery Location and Clearance Rules in Australia

    Understand AS/NZS 5139:2019 Amendment 1 rules for home battery installation in Australia, including clearances, restricted locations, and SDS requirements.

  2. Battery Storage RCD and Switchboard Requirements in Australia

    Understand Australian RCD and switchboard requirements for Battery Energy Storage Systems (BESS), including the ban on Type AC RCDs and mandatory testing.

  3. CEC Approved Battery List Australia: SA TS 5398 Transition Explained

    The CEC battery register is moving to SA TS 5398: dual-standard applications from Jan 2026, TS-5398-only from Jan 2027, certificates valid 3 years.